New single storey side extension behind existing retained garage
17 Allens Orchard Brampton Huntingdon PE28 4NW
18th June 2026
T1 (Ash) - Reduce the tree by 3-4m as tree is getting big again for the rear of the garden and has had a few large branches snap out of the tree, so want to take the weight out of it
7 Pages Way Brampton Huntingdon PE28 4UR
18th June 2026
First floor extension to dwelling
31 Elizabethan Way Brampton Huntingdon PE28 4SU
19th May 2026
Single storey front extension
8 Cranfield Way Brampton Huntingdon PE28 4QZ
15th April 2026
Works to be completed to trees covered by TPO 002/80. Horse chesnut tree - canopy reduction by approx. 4/5 metres and thinning works up to 25%
24 High Street Brampton Huntingdon PE28 4TH
9th April 2026
Variation of condition 2 (development in accordance with plans) of 25/02231/FUL
Brampton Mill Bromholme Lane Brampton Huntingdon PE28 4NE
30th March 2026
Remove fallen tree
20 Pages Way Brampton Huntingdon PE28 4UR
30th March 2026
Single storey rear extension following demolition of existing conservatory alongside replacement windows and doors
38 The Green Brampton Huntingdon PE28 4RQ
10th March 2026
T1 Dead Cherry - Remove
10 Centenary Way Brampton Huntingdon PE28 4YQ
10th March 2026
Lawful development certificate for a proposed conversion of half of the double garage to habitable space
19 High Street Brampton Huntingdon PE28 4TG
5th March 2026
T1 Field Maple - Fell
93 High Street Brampton Huntingdon PE28 4TQ
24th February 2026
T1 - Removal of dead wood and a large branch which has fallen to a lower level
7 Buckden Road Brampton Huntingdon PE28 4PR
19th February 2026
T1 Corkscrew Willow - reduce height by approx 2m
38 West End Brampton Huntingdon PE28 4SD
17th February 2026
Demolition of the rear conservatory and construction of a single-storey rear extension with a pitched roof
50 High Street Brampton Huntingdon PE28 4TH
6th February 2026
Proposed conversion of out building into dwelling building (linked to 26/00200/FUL)
91 High Street Brampton Huntingdon PE28 4TQ
30th January 2026
Erection of a greenhouse/ shed out-building, climbing frame/ swing and decking
7 River Lane Brampton Huntingdon PE28 4PU
30th January 2026
Discharge conditions 3 (materials), 4 (windows), 5 (landscape), 6 (bin storage), 7 (cycle storage), 9 (surface water drainage) and 11 (contamination phase 1) of permission 25/00626/S73.
111 High Street Brampton Huntingdon PE28 4TQ
29th January 2026
Replacement brick garden wall to part of the western boundary.
T1 and T2 Larch - Fell (rapidly declining condition)
91 High Street Brampton Huntingdon PE28 4TQ
23rd January 2026
Erection of a greenhouse/shed out-building, climbing frame swing and decking
18 Hawkes End Brampton Huntingdon PE28 4TW
15th December 2025
Single and two storey rear extension with new replacement porch, change in materials and windows
21 High Street Brampton Huntingdon PE28 4TG
10th December 2025
T1 Mulberry tree: fell. Reason: the tree has vastly overgrown and is blocking a substantial part of the garden and the view down the garden. It has suffered from a number of large falling branches recently. T2 Holly tree: fell. Reason: It is tall and th
1 Allens Orchard Brampton Huntingdon PE28 4NW
8th December 2025
T1 Ash reduce laterally by 2.5m
Reason: Lateral branches are within 1.5 metres of the rear of the house; proposed work will keep the tree clear of the building